In Xserp you can add a GRN for multiple purchase order.
Creating GRN:
- Go to Stores >> Goods Receipt (GRN).
- GRN page will open.
- Click + Create.
- GRN page will open.
- Fill the fields with details.
- Click Save.
- Saving the entry will redirect to GRN Page.
- The status of the GRN will be in Draft.
- Click the draft and the PDF preview will open.
- Click the Approve button in the top.
- GRN number will be assigned to the record.
Field | Description |
Tags | Enter your keyword here |
Project | You can create and choose the project to which this material belongs to or choose internal as default |
Received against | Choose the scenario from the drop down |
Received from | Choose the customer/vendor from the drop down |
Purchase order no | Choose your purchase order number from the drop down |
Indent type | Choose the type of the goods |
attachment | Attach the soft copy of DC/ invoice received from the supplier |
Received as | Toggle between dc/invoice, based on the received document |
Party dc no | Enter the document number Eg: dc number or invoice number |
Party dc date | Enter the date of the document |
Received date | Enter the date of the material been received |
Received through | Enter the mode of transport |
Material | Material list gets auto-populated from thee chosen PO |
PO pending | Pending quantity in PO will be displayed |
Dc/invoice | Enter the quantity mentioned in the party’s invoice |
Received | Enter the actual physical quantity |
Shortage | Shortage will calculated automatically |
Accepted | Enter the accepted quantity(based on the QC) |
Rejected | Rejected will be calculated automatically |
Price/unit | Enter the price mentioned in the party’s invoice |
Tax | Choose the tax from thr drop down in the respective cell |
Gate inward no | Enter the gate inward number if available |
Gate inward date | Enter the date of goods inward |
Inspector name | Enter the name of the quality inspector |
Tax applicable | Enter if any tax applicable |
Fields with (*) marks are mandatory.
Under purchase order drop down you can choose as many PO needed , also u can enter partial quantity for a chosen PO, so that the PO will be left open for the balance quantity.